12/23/2023 0 Comments Free pictures of broken roads of lifeAras said BBMP too does not carry out checks post work completion. The norms were drafted by KN Shivashankar Rao, retired chief engineer, based on Indian Road Congress guidelines. He said the guidelines for construction and maintenance of roads were announced in 2009, but contractors are not adhering to them. Both BBMP and BWSSB are to be blamed for this," he claimed. When the road caves in, people talk about seepage, but there are hundreds of potholes caused due to water leakage. Failing to take the load, the pipes break causing seepage. "The BWSSB, which lays pipelines after digging up roads, does not use covers to protect these lines. Nagesh Aras, a civic expert, said not complying with guidelines (while laying roads) is the key reason why these instances are repeating. sister, Carrie, they have broken free and scraped together enough for three. Common phenomenon Road cave-ins on multiple arterial streets have further dented the already poor reputation of BBMP, besides highlighting substandard works by the contractor. hard to find an aspect of modern life that hasnt been touched by Bell Labs. A BWSSB official said that their men are working to fix the leakage. A road in Kengeri too caved in and the same reason was cited. "Seepage caused the sinking of the road and henceforth this won't happen," he said and added that there is no leakage in other parts of the road and after the wet mix settles, asphalting will be done. Lokesh said the underpass work was executed as per standards and there was no low-quality work unlike in Sumanahalli bridge. Browse 84,371 broken road stock photos and images available, or search for broken road sign or broken road icon to find more great stock photos and pictures. It was slack welding that caused the problem, he said. ![]() Asked why the pipe couldn't withstand the load and pressure created by vehicular movement, he said it had nothing to do with pressure and the pipes are intact. A road is a linear way for the conveyance of traffic that mostly has an improved surface for use by vehicles (motorized and non-motorized) and pedestrians. ![]() BBMP chief engineer (projects) Lokesh told TOI there was a problem with the welding between two pipes, due to which there was a leakage. It’s this problem that needs fixing first. But what tops it is city planners’ inability to make amends, get on the same page and work as a team. Potholes, cave-ins, encroachments the list of ills is long. Citizens, meanwhile, have no choice but to venture out on the same treacherous roads. No amount of bristling criticism, online or offline, seems to have any impact on the quality of planning, coordination and execution of civic works. Assigning blame is easy and that’s what Bengaluru’s civic agencies do every time the city’s fragile infrastructure stands exposed. Browse 21,909 broken road stock photos and images available, or search for broken road sign or broken road edge to find more great stock photos and pictures.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |